Mumbai Metro Line 2B: Trial Runs Begin On 5.4 Km Mandale-Mankhurd Stretch
Mumbai Metro Line 2B: Overhead Equipment Network Energisation On 5.6 Km Stretch Between Mandale and Diamond Garden To Begin From 8 April